After re-railing over a dozen loaded coal hoppers earlier in the day, CSX and contracting crews continue to repair the track and right of way. At this point, crews have been on scene for over 12 h... (more)
After departing the loadout at Tom's Fork with 150 loads of export coal, the train encountered a broken/rolled rail near the mining community of 'Miami', where 13 of the 150 loads derailed. While ... (more)